Overview

India's Most Challenging Moves — Handled with Precision

Over-Dimensional Cargo (ODC) transport requires a rare combination of specialized equipment, statutory expertise, and operational precision. Jayesh Trans Movers has built a dedicated ODC capability serving India's power sector, oil & gas, heavy engineering, and infrastructure industries.

Whether you're moving a 60 MT power transformer from a manufacturing plant in Gujarat to a substation in Maharashtra, or transporting a reactor column from a chemical complex to a port for export — our ODC team handles every aspect: route survey, permit procurement, escort coordination, and specialized equipment deployment.

ODC heavy haulage transport - large industrial equipment
Multi-axle hydraulic trailer deployment for industrial equipment transport

Our ODC fleet includes hydraulic axle trailers, low-bed platforms, extendable trailers, and multi-axle combinations. Every move is pre-planned with an engineering survey report identifying route constraints — bridges, power lines, underpasses — with mitigation plans for each obstacle.

Key Capabilities

What Sets Our ODC Service Apart

  • Hydraulic axle trailers — up to 100+ MT payload capacity
  • Low-bed & extendable trailers for long/wide loads
  • Complete permit procurement — state, NHAI, police escort
  • Pre-move route survey with engineering clearance documentation
  • Pilot vehicle escort and traffic management
  • Specialized lashing, chocking & load-securing engineers
  • Night-movement coordination for high-restriction corridors
  • Real-time GPS tracking throughout the entire movement
ODC Classification

When Does Cargo Become "ODC"? — Legal Thresholds

Under the Motor Vehicles Act and Central Motor Vehicles Rules, any cargo exceeding the following limits on a standard vehicle is classified as Over-Dimensional Cargo and requires a special permit before movement:

Dimension Standard Legal Limit ODC Trigger Point Additional Requirement
Length Up to 12 metres Above 12 m State ODC permit + rear warning
Width Up to 2.5 metres Above 2.5 m Permit + police pilot escort
Height Up to 4.2 metres Above 4.2 m Route survey for bridge/underpass clearance
Gross Weight Up to 16.2 tonnes (standard axle) Above 16.2 T Multi-axle platform + NHAI permission
Overhang Up to 1.2 m (rear), 0 m (front) Beyond these limits Special lighting + permit endorsement

Limits vary slightly by state. Some states (e.g. Maharashtra, Rajasthan) have additional night-movement restrictions for ODC loads wider than 3.5 m. Our permit team verifies state-specific rules for every move.

Permit Timeline

How Long Does ODC Permit Processing Take?

Understanding the permit timeline helps your project team plan the ODC move effectively. Below are indicative processing times under normal conditions:

1

Route Survey

3–7 days. Our surveyors physically inspect the route identifying low bridges, power line crossings, sharp bends, weak road sections, and urban restrictions. Documented with photos and GPS coordinates.

2

State Transport Department Permits

5–10 days per state. Required from each state the load passes through. We file simultaneously for all states to reduce total time.

3

NHAI Permission

3–7 days. Required for movement on National Highways when gross weight exceeds limits. Filed online via NHAI portal.

4

Police Escort NOC

2–5 days. Required in most states for loads wider than 3 m. We coordinate with local police stations along the route.

5

Total Lead Time

14–21 days for a typical multi-state ODC move. Complex routes (crossing 4+ states) or extreme dimensions may require 25–30 days. Share your cargo details early for best scheduling.

Performance

ODC Operations by the Numbers

500+
ODC Moves Completed
100T
Max Load Capacity
18+
States Covered
0%
Damage Record
How It Works

Our ODC Move Process — Step by Step

1

Cargo Survey & Assessment

Our engineers visit the cargo location. Dimensions, weight, centre of gravity, and lifting points are documented. We confirm required equipment type and trailer configuration.

2

Route Survey

A dedicated team surveys the entire route — from loading point to delivery. All constraints (bridges, underpasses, sharp curves, power lines) are photographed and documented with clearance status.

3

Permits & Escort Coordination

We obtain all statutory permissions: state transport permits, NHAI permissions, and police escort coordination. Permit timelines vary by state (typically 5–15 working days).

4

Equipment & Rigging

Specialized trailers are positioned at the loading site. Our rigging engineers supervise loading, lashing, and cargo securing using certified lifting equipment and tie-down systems.

5

Escorted Transit

Movement commences with pilot vehicles front and rear. Night movement schedules are followed where required. Real-time updates are shared with the client throughout transit.

6

Delivery & Unloading

Cargo is delivered to the precise location specified. Unloading is supervised by our engineers. Completion certificate and photos are provided upon successful delivery.

Industries We Serve

Sectors That Rely on Our ODC Expertise

Power & Energy
Transformers, turbines, generators
Oil & Gas
Pressure vessels, columns, reactors
Construction
Cranes, excavators, pre-cast
Wind Energy
Turbine blades, nacelles, towers
Heavy Engineering
CNC machines, presses, boilers
Chemical Plants
Storage tanks, columns, vessels
FAQ

Frequently Asked Questions — ODC Transport

What is ODC transport?
ODC (Over-Dimensional Cargo) is any cargo that exceeds normal road dimensions or weight limits — typically length over 12m, width over 2.5m, height over 4.2m, or weight over 16.2T. Such cargo requires special equipment, statutory permits, and pilot escort.
What permits are required for ODC transport?
Required permits include: state transport department permits (each state), NHAI permissions for national highway routes, and police escort permissions in certain states. We manage all permit procurement, which typically takes 5–15 working days.
What is the maximum weight you can transport?
We regularly transport loads up to 100 MT using multi-axle hydraulic trailer combinations. Heavier loads require an engineering feasibility assessment. Contact us with your cargo specifications for a detailed evaluation.
How long does an ODC move take to plan?
Planning typically takes 2–4 weeks including: route survey (3–7 days), permit procurement (5–15 days), equipment mobilization (2–5 days). Actual transit time depends on route length and movement restrictions.
Tags
ODCHeavy Haulage Abnormal LoadHeavy Machinery Hydraulic TrailerIndustrial Transport
Share

Plan Your ODC Move

Share your cargo dimensions and route. Our ODC specialists will assess feasibility and provide a detailed quote.

Call us anytime
+91 79728-09543
Get Free Quote

Service at a Glance

Max Weight100+ MT
Max DimensionsNo limit
PermitsAll states
EscortIncluded
Route SurveyIncluded
GPS TrackingReal-time
Start Today

Ready to Move Your
Business Forward?

Get competitive freight rates and end-to-end logistics support across India — FTL, PTL, ODC & Express, from Vapi to every destination.

Jayesh Trans Movers

Jayesh Trans MoversOnline

Jayesh Trans Movers
Hi there 👋

How can I help you?
9:00